Post Your Answer
Ans 1: (Master Answer)
Class : Class 1
(B): Number of toys produced in 1 day = 869
Number of days in 3 weeks = 7 x 3 = 21
Number of toys produced in 3 weeks i.e. 21days = 869 x 21
= 18249
Post Your Answer
Ans 1: (Master Answer)
Class : Class 1
(D): According to question, we have
= 7.50 – 2.75 = 4.75 kg
∴ = 2
= 2 × 4.75 = 9.5 kg
Post Your Answer
Ans 2:
Class : Class 3
in table 2 the order is delhi chennai mumbai whereas in table 1 the order is delhi mumbai then chennai
Ans 3:
Post Your Answer
A rectangular sheet of paper is folded as shown below.
Find:
(i) The area of the rectangular piece of paper if
unfolded.
(ii) The perimeter of rectangular piece of paper if unfolded.
(i) | (ii) | |
---|---|---|
A | 200 cm2 | 60 cm |
B | 800 cm2 | 120 cm |
C | 800 cm2 | 60 cm |
D | 400 cm2 | 120 cm |
b
Post Your Answer
Ans 4:
Class : Class 7
wrong question, as right angle formation is only possible wrt to hr hand or sec hand and answer to this question is not possible, as the minutes hand forms 06 times right angle with hr hand from 3 am to 6am, the option is not available.
Post Your Answer
Post Your Answer
Find the values of P, Q, R and S.
P | Q | R | S | |
A | 800 | 200 | 1000 | 2 |
B | 800 | 800 | 300 | 400 |
C | 800 | 300 | 400 | 800 |
D | 800 | 400 | 300 | 800 |
I attempted the question. Very Wrong SOF!!!!!!!!!!!!!!!